Contract Agreement - 25 Yrs
Brief of Tasks - Talcher Colliery Underground Coal Mine is a very old mine started way back in 1928 by Madras and Southern Mahratta Railway (MSM Railway). However, after running for 95 years, the mine operation was discontinued by Mahanadi Coalfield Limited (MCL) in 2018. TMC Mineral Resources Private Limited has taken up the challenge for reopening, salvaging, rehabilitation, development and operation of this discontinued underground coal mine producing coal of 0.36 MTPA. The reopening of Talcher Underground coal mine would be a crucial milestone in revitalizing coal production. This public-private partnership (PPP) between Mahanadi Coalfield Limited (MCL) and TMC Mineral Resources Private Limited, under a Revenue Sharing Model, promises to create a win-win situation, bolstering economic growth while ensuring sustainable mining practices for a better and greener tomorrow.
Contract Agreement - 25 Yrs
Brief of Tasks - Bartunga Hill mine is a part of Chirimiri Colliery which was started in 1928. It was the first mining venture in this coalfield. Originally the mine belonged to Ballarpur Colliery Company and later by Chirimiri Colliery Company owned by M/S DAGA Brothers, till it was nationalized in 1973. This mine was bifurcated into two mines namely Chirimiri opencast mine and Chirimiri underground mine in the year 1976. Workings in Chirimiri underground mine have been done under two hills namely Bartunga Hill and Anjan Hill. Chirimiri underground mine was further subdivided into two mines on 01-09-2000 and were named, after the hills under which workings being done namely Bartunga Hill Mine and Anjan Hill Mine.
TMC Mineral Resources Private Limited and Sarda Energy & Minerals Limited has taken up the challenge for reopening, salvaging, rehabilitation, development and operation of this underground coal mine producing coal of 0.42 MTPA. This public-private partnership (PPP) between South Eastern Coalfield Limited (SECL) and TMC-SEML Consortium, under a Revenue Sharing Model, promises to create a win-win situation, bolstering economic growth while ensuring sustainable mining practices for a better and greener tomorrow.
Contract Agreement - 5 Yrs
Brief of Tasks - We are going to work as a Mine Operator for this prestigious coal mine of South Eastern Coalfield Limited. The mine is planned to be operated through deployment of fully mechanized cutting technology of Continuous Miner package for coal production of 0.66 MTPA.
Contract Agreement - 8 Yrs
We are going to work as a Mine Operator for this prestigious coal mine of South Eastern Coalfield Limited. The mine is planned to be operated through deployment of fully mechanized cutting technology of Continuous Miner package for coal production of 0.45 MTPA at Chirimiri Area.
Contract Agreement - 11 Yrs
Brief of Tasks - We are going to work as a Mine Operator for this prestigious coal mine of South Eastern Coalfield Limited. The mine is planned to be operated through deployment of fully mechanized cutting technology of Continuous Miner package for coal production of 0.465 MTPA at Jamuna & Kotma Area.
Contract Agreement - 12 Yrs
Mine Development and Coal Mining Operation at Sial Ghogri Underground Coal Mine.
Brief of Tasks - Mine Development and Coal
Mining Operation at Sial Ghogri Underground Coal Mine. Work as a MDO for development of Mining & Civil Infrastructure
including Coal Production. The mine id being operated through deployment of mechanisd technology of Road
Headers, having capacity of mines to produce 0.3 MTPA Coal from Undeground by high mechanised means.
Contract Agreement - 10 Yrs
Brief of Tasks - Mine Development and Operation (MDO) for Bicharpur Underground Coal Mine (UTCL) Shahdol, Madhya Pradesh, having capacity of Minesisto produce 0.3 MTPA coal from underground by higly mechanised means.
Contract Agreement - 20 Yrs
Mine Development & Operation (MDO)
Brief of Tasks - Working as MDO for Development, Operation, Maintenance, Excavation & Delivery of Coal at the designated coal stockyard from Gare Palma IV/7 Opencast Coal Mine at Karwahi, Tamnar, Dist: Raigarh, Chhattisgarh.
Capacity of the Mines is to produce 1.2 MTPA Coal with over all stripping ration of 2.80 (M3/tn).
Contract Agreement - 5 Yrs
Brief of Tasks - Operation & Maintenance of 02 nos. of Continuous Miner packages of SECL for winning coal without blasting from the districts in Churcha underground mine of SECL. Churcha RO underground mine of SECL for 1 MTPA.
Contract Agreement - 5 Yrs
Working as Mine Developer & Operator (MDO) for this prestigious coal mines. The mine is being operated through deployment of fully mechanised hybrid cutting technology of continuous miner package for coal production of 0.5 MTPA.
Contract Agreement - 10 Yrs
Brief of Tasks - FMC and Machine Consumables for Sandvik make Multiutility Vehicles (MUV’s) at Bicharpur Underground Coal Mine of M/s Ultratech Cement Limited, Shahdol, MP
Contract Agreement - 30 Yrs
Brief of Tasks - TMC Group won the two commercial iron ore blocks (Lohattar and Tendubhata) under Prospecting cum Mining lease scheme (Composite License) under the mineral auction rule. The initial mining lease period will be for 30 years.
Tendubhata block (113.625 hectares) is situated in khairagarh district having high-grade iron ore deposit.
Lohattar iron ore block (40 hectares) is situated in kanker district having hematite ore.
Contract Agreement - 15 Yrs
Brief of Tasks - The company is engaged in opencast mining operation under MDO contract in Iron ore deposit located at Kanker district of Chhatisgarh with an guaranteed quality(+65%Fe) ore delivery. It includes Mine Planning, Excavation, Drilling, Blasting, Dump Management, Screening, Crushing and Loading the finished goods in to dispatch trucks. Present capacity 2.4 MTPA is going to enhance 5 MTPA. Excavation of waste is 72 Lacs MT / per annum and finished ore is 40 Lacs MT/per annum from this Mine.
Contract Agreement - 10 Yrs
Brief of Tasks - Drilling & Blasting Services at Boriya Tiphu iron ore mines
Contract Agreement - 8 Yrs
Brief of Tasks - Hiring of equipments for excavation, magnetic separation, crushing, screening, transportation and delivery of iron ore at the delivery point in Ari Dongri iron ore mine, Kanker district
With a vision to raise an enviable army of next-generation mining workforce, the foundation of MTA has been laid. We aim to skill up people and develop a mindset to solve the challenges within the industry through the lens of contemporary technologies.
Contract Agreement - 3 Yrs
Brief of Tasks - Removal of 1.0 million cu. Meter De-silted iron ore fines from Hitkasa Dam.
Contract Agreement - 2 Yrs
Brief of Tasks - Rake Loading at Dalli & Rajahara Siding for 11.5 million tone iron ore
Contract Agreement - 5 Yrs
Re-handling of Fines & Lumps in Iron Ore Mines:
Brief of Tasks - TMC is engaged as MDO for Material handling and operating with a quantity of 18 Lacs MT of fines and ROM Per year.
Contract Agreement - 3 Yrs
Brief of Tasks - Underground Horizontal Development by Mechanised means at Ukwa Mine (MOIL Limited), Po: Ukwa, Tehsil: Paraswada, Dist: Balaghar, Madhya Pradesh
Contract Agreement - 3 Yrs
Brief of Tasks - We have been awarded contract for incline Drivage for Production of Coal from GP IV/8 Coal Mine. The contract includes development of excess trench, development of mine by providing plant, machineries & manpower for operation by complying all the statutory rules and regulations.
Contract Agreement - 19 Yrs
Pre-Mining:
Brief of Tasks - TMC is engaged for providing Pre-Mining services right from Mining lease, Land acquisition to opening of the mines including Land Acquisitions, Forest clearance, DGPS survey, Scientific studies, posting of pillars & all other statutory clearances, Site office setup, Tree enumeration & cutting, Power Line and Substation Setup, Explosive License and Magazine Construction, obtaining final order for possessions etc.
Working as MDO of Opencast Mine
Brief of Tasks -To ensure the Deployment of HEMM for removal of waste materials from the mine, arrangement of power, illumination, explosives, water, dewatering drilling & blasting, transportation of overburden from operation face to dumping place, dump yard management etc by complying all the statutory norms along with local Liasoining.
Sr | PROJECTS | VALUE IN CRORES |
---|---|---|
01 | CURRENT PROJECTS | 19,699.00 |